# 2026-07-01-为什么是我们 ## Status - Status: P01-P22 full-page image production completed via production-light child sessions. - Medium type: 16:9 internal sales-alignment PPT. - Output direction: full-page visual-image-led deck. - Current phase: PPT assembly complete. - Next phase: user visual sampling or append-only repairs if requested. - Review default after validation: none, unless the user requests append-only repair. ## Positioning This deck is the prequel / confidence-fronting deck for `2026-06-29-搭上AI这条船`. The previous deck answered: > 我们怎么上船,怎么组队,怎么训练,怎么开始干。 This deck answers: > 为什么这艘船值得上?为什么不是平台?为什么不是普通 AI 开发公司?客户凭什么选我们? The deck is an internal sales cognition and confidence alignment file. It is not a customer proposal and not a full re-compression of source material. ## Fixed Mainline The P1-P22 story line is fixed: ```text 问题提出 → 市场对照 → 我们定位 → 客户选择理由 → 内部短板 → 销售武器库建设路线图 ``` The final portable internal consensus is: > 平台解决工具怎么搭,普通 AI 开发公司解决功能怎么做,我们解决专家能力怎么被抽取、封装、验证、校准,并进入客户真实业务流程。 ## Source Hierarchy Primary deck authority: 1. `intake/阶段5:P1-P22 单页设计骨架.md` 2. `intake/阶段3:PPT 总纲 v1.md` 3. `intake/阶段4:通用表达与视觉系统.md` Style continuity reference: ```text ../2026-06-29-搭上AI这条船/visual-system/ ../2026-06-29-搭上AI这条船/slides/s01/s01-v1-image.png ../2026-06-29-搭上AI这条船/slides/s10/s10-v1-image.png ``` Backup fact-check source only: ```text C:\Users\wangq\Documents\Codex\knowledge-vault\work\internal\OPC销售\为什么是我们.md ``` Fact-check rule: > 原材料只作事实校验,不允许重新压缩成 PPT,不允许新增大段原文,不允许改变 P1-P22 主线。 The backup source has not been used to create the validation pages. It should be opened only when a factual claim in the accepted intake needs verification. ## Visual Direction Continue the accepted previous deck base: > 深蓝黑商务底 + AI 航线 + 雷达 + 罗盘 + 金色 / 青色高亮关键词。 This deck should be harder and more sober than the kickoff deck: > 上一套是“上船”;这一套是“看清水深”。 Working visual sentence: > 深蓝黑 AI 航线作战图底板上,进入更深的业务水域:平台是工具箱,普通 AI 开发公司是施工队,我们是专家智能体的系统架构师与模具师。 ## Validation Scope The user authorized two validation pages: | Slide | Role | Validation Target | | --- | --- | --- | | P01 / S-01 | Cover | Tests the harder prequel cover tone: deepwater, title, route-map base, sales confidence framing. | | P10 / S-10 | Content anchor | Tests the core positioning page: expert capability extraction, molding, validation, calibration, and workflow entry. | The validation stage did not require completeness or broad quality checks. On 2026-07-01, the user confirmed P01 and P10 passed and authorized formal production. ## Operating Defaults | Item | Default | | --- | --- | | Current line | production-light | | After validation | production-light active | | Running mode | prompt and generate | | Review mode | user sample check only; no routine review file | | Write policy | append-only; overwrite allowed: no | | Image prompt workflow | `gpt-image-2` Advisor / host-native Mode B | | Generated media policy | keep Markdown control files in Git; generated images are asset-layer files recorded by path | ## Generated Validation Outputs | Slide | Project Image Path | Host Default Source | | --- | --- | --- | | S-01 | `slides/s01/s01-v1-image.png` | `C:\Users\wangq\.codex\generated_images\019f1b6b-387f-7be2-af0a-03761085cdae\ig_03b93517b169e69c016a44798e01f481918324c93b7cc1cdef.png` | | S-10 | `slides/s10/s10-v1-image.png` | `C:\Users\wangq\.codex\generated_images\019f1b6b-387f-7be2-af0a-03761085cdae\ig_08ab80c795c4cfff016a447a1cae588191ae265e781d9dca16.png` | ## Assembled Deck | Artifact | Path | Notes | | --- | --- | --- | | PPTX | `slides/why-us-full-page-images.pptx` | 22 slides; one full-slide image per page. | Assembly verification: - The PPTX was exported with `@oai/artifact-tool`. - The exported PPTX was re-imported successfully with 22 slides. - Final rendering produced 22 preview PNGs in scratch. - `slides_test.py` passed with no overflow detected. ## Production Packages Parent callback target: ```text 019f1b6b-387f-7be2-af0a-03761085cdae ``` | Package | Scope | Status | Notes | | --- | --- | --- | --- | | package-01 | S-02 through S-09 | complete from `019f1b86-b337-7553-9084-610f0421e5e3` | 8-page ordinary production package. Handoff: `tasks/2026-07-01-production-dispatch/package-01-handoff.md`. | | package-02 | S-11 through S-18 | complete from `019f1b87-7dd8-7e91-b50e-7f2e25dd5464` | 8-page ordinary production package. Handoff: `tasks/2026-07-01-production-dispatch/package-02-handoff.md`. | | package-03 | S-19 through S-22 | complete from `019f1b88-4d73-79e1-bf4d-b59d7e79dfa0` | 4-page closing package. Handoff: `tasks/2026-07-01-production-dispatch/package-03-handoff.md`. | ## Next Action PPT assembly is complete. Next work is user visual sampling or append-only repair for any page the user marks unusable.