# S-17 Slide Brief V1 ## Status - Line: production-light - Running mode: prompt and generate - Review mode: none - Version: v1 - Overwrite allowed: no ## Source Basis - `project.md` - `execution-plan.md` - `slides/slides.md` - `visual-system/visual-system.md` - `visual-system/style/style-prompt-master.md` - `visual-system/motifs/motif-registry.md` - `intake/阶段3:PPT 总纲 v1.md` - `intake/阶段4:通用表达与视觉系统.md` - `intake/阶段5:P1-P22 单页设计骨架.md` ## Slide Function 说明客户选择我们的第四个理由:先验证智能流,再投入系统建设。 ## First Read 很多 AI 项目失败,是因为太早开发。 ## Risk Class PPT page / route comparison / validation path ## Reference Plan - Active style module: Module D / Customer Choice. - Core motif: 智能流试航. - Reference images: four loaded style continuity references. - Character references: none. ## Visual Requirements Show a wrong heavy-build route and a correct validation route. The validation route should feel like disciplined engineering, not hesitation. ## Character Handling No people. No literal customer team photo. ## Composition / Scale Two horizontal routes, upper risk route and lower validated route, with bottom judgment bar. ## Light / Color / Texture Deepwater map base, cyan validated path, gold decision points, muted risk red for wrong route. ## Forbidden Drift No waterfall project-management chart, no cute ship, no implication of weak development capability, no dense paragraph text. ## Acceptance Checklist - Upper route shows too-early heavy development risk. - Lower route shows minimum intelligent flow validation. - “先跑通价值” is first-read or bottom-read. - Title and core judgment readable. - No review file produced. ## Prompt Handoff Use GPT Image 2 Advisor / host-native Mode B. Save prompt first; generate with host image tool; copy final image to `slides/s17/s17-v1-image.png`.