# Child Session 01 Handoff - Status: complete - Topology: direct-child - Callback: ready-to-send-as-final-action - Review mode: none - Resolved versions: `S-48 -> s48-v1`; `S-49 -> s49-v1`; `S-50 -> s50-v1` - Image paths: - `projects/2026-06-23-在路上/slides/s48/s48-v1-image.png` - `projects/2026-06-23-在路上/slides/s49/s49-v1-image.png` - `projects/2026-06-23-在路上/slides/s50/s50-v1-image.png` - Problems: none - Needs user: none - Observed elapsed/context: not visible to child session ## Parent Summary Final production package `S-48/S-49/S-50` completed through direct child production-light. The child wrote per-slide briefs and prompts, used `gpt-image-2` Advisor / host-native Mode B workflow, loaded visible references before generation, copied host-generated images into the project slide folders, updated `slides/slides.md`, `task-log.md`, and `production-run-status.md`, and kept review mode `none` with no `sNN-vN-review.md` files.