knowledge-vault/discussions/viewpoint-development/2026-06-05-失望性情感隔离/03-run-notes.md

3.0 KiB

Run Notes

1. Run Identity

run_id: 2026-06-05-失望性情感隔离
workflow: viewpoint-discussion-distillation
workspace: discussions/viewpoint-development/2026-06-05-失望性情感隔离
source: diary/2026/2026-06/2026-06-05.md
created: 2026-06-06

2. Decisions Already Settled

- Work directory uses discussion topic, not generic GPT label.
- Public reusable operating rules live under skills/.
- Run-specific invocation records live inside this work directory.
- Main session must not process the full source as one context.
- conversation-segmentation may be locally executed because the CCPE Skill spec is explicit enough.
- topic-discovery-router must not be simulated; if no real participant is invoked, stop at prompt-to-send.

3. Current Pass

pass: stopped
status: legacy_pre_gestalt_misread_demo
replacement_workspace: discussions/viewpoint-development/2026-06-05-失望性情感隔离2

This run is retained as a record of the old chunk-first workflow. Its worker outputs, topic map, and hierarchy proposal are exploratory evidence only and must not be used as routing authority.

4. Boundary Notes

- Numeric H1 headings # 1 through # 7 are runtime rounds.
- The H1 at source line 21 is an embedded article title inside R01.
- Source file line counts differ across PowerShell counting methods; .NET UTF-8 ReadAllLines count is used for source-map ranges.

5. Confirmation Gates

Gate A: Confirm source-map and source block ID convention.
Gate B: Confirm whether to run topic-discovery-router externally or by another real participant mechanism.
Gate C: Confirm candidate topic-map before routing.
Gate D: Confirm downstream routing before writing, CCPE modeling, engineering, scale extraction, todo extraction, or continued research packets.

6. Current Blockers

current_gate: superseded_by_new_step0_run
participant_outputs:
  - R01 topic-discovery worker completed
  - R02 topic-discovery worker completed
  - R03 topic-discovery worker completed
  - R04 topic-discovery worker completed
  - R05 topic-discovery worker completed
  - R06 topic-discovery worker completed
  - R07 topic-discovery worker completed
needed_user_decision:
  - do not repair this run in place
  - restart in the replacement workspace with Step 0 Whole-Source Gestalt Alignment
  - preserve this run as evidence of old-flow distortion

7. Latest User Corrections

- ROOT accepted: 从失望性情感隔离到认知生成与关系治理.
- A/B/C/D/E macro structure accepted.
- A2 should be a subsection under A1.
- E2 家庭三角认知场 should remain as a strong model candidate.
- Current C/D details are not correct enough for routing.
- QPI is not a parallel C-layer topic; it is a tool inside 巨人方舟's 元认知 / I-domain judgment layer.
- 巨人方舟 is the chosen name.
- 巨人认知 2.0 upgrades to 巨人方舟 by strengthening GL0, adding GL-R, adding action experiment layer, and limiting GL4's dictatorship.
- Do not proceed to material routing yet.