8.5 KiB
8.5 KiB
03 Run Notes
Run State
run_id: 2026-06-12-复杂度放置门
workflow: viewpoint-discussion-distillation
current_phase: Step 0 whole-source gestalt alignment
current_phase: broad-fidelity worker dispatch
status: worker_invocation_packets_prepared
child_thread_id: 019eb88c-4bab-7b21-9ab1-f14e07db46a1
source_primary_language: zh-CN
output_language_policy: mirror_source_primary_language
main_session_primary_extraction_allowed: false
Decisions
2026-06-12: Source Registration
- Source file registered at
C:\Users\wangq\Documents\Codex\knowledge-vault\diary\2026\2026-06\2026-06-12.md. - Work directory confirmed as
C:\Users\wangq\Documents\Codex\knowledge-vault\discussions\viewpoint-development\2026-06-12-复杂度放置门. - Source has 5 numeric H1 conversation rounds and 5079 lines.
## GPTmarks the GPT response start inside each numeric round.- Non-numeric H1 headings inside rounds are content headings, not round boundaries.
2026-06-12: Structural Prior
User supplied this guiding interpretation:
深度创作流程就是我在践行我的 AI 开发方法论。
Step 0 must therefore avoid a premature binary split between:
- 前三回合: 深度创作流程
- 后两回合: AI 开发方法论
The participant may still recommend macro-splitting if the source evidence requires it, but it must first test the stronger unified hypothesis:
deep creative workflow = lived/practical instantiation of the AI development methodology
2026-06-12: Step 0 Sent
- Step 0 was sent to Codex child thread
019eb88c-4bab-7b21-9ab1-f14e07db46a1. - Child thread title:
Step 0 whole-source gestalt: 2026-06-12 复杂度放置门. - Required return path:
invocations/whole-source-gestalt-reviewer/returned-output.md. - Status at handoff from main session:
in_progress.
2026-06-12: Step 0 Returned Output Available
- Returned output exists at
invocations/whole-source-gestalt-reviewer/returned-output.md. - File size at verification: 20733 bytes.
- Participant thread id recorded in output:
019eb88c-4bab-7b21-9ab1-f14e07db46a1. - Local verification confirmed no
01-topic-map.mdor02-material-routing-log.mdexists. topics/andaudits/remain empty.- Child thread status at final app check:
completed; thread statusidle. - The returned output is internally marked
human_confirmation_status: pending.
Step 0 provisional result:
coherence_judgment: coherent
main_axis_recommendation: unified_main_axis
recommended_downstream_mode: structure-first
topic_organization_recommendation: mixed_graph
worker_lens_recommendation: required
human_confirmation_status: pending
2026-06-12: Gate 0 Confirmed With Constraints
- Confirmation record:
invocations/whole-source-gestalt-reviewer/human-confirmation.md. - Root theme accepted:
复杂度放置门. - Three downstream task directions:
- 第 8 篇文章
- HiFi Agent Studio 补丁
- Agentic Handbook 守则
- Practice flows are case-layer material, not independent parent topics.
- Model assets are forbidden in this run.
video-workbenchis excluded.- GPT external links remain discussion material only.
- Permission granted: create segmentation worker design and dispatch broad-fidelity workers.
- Still forbidden:
01-topic-map.md,02-material-routing-log.md, topic docs, audits, model assets, writing-workbench handoff.
2026-06-12: Broad-Fidelity Worker Packets Prepared
- Worker design:
04-segmentation-worker-design.md. - Worker status:
05-broad-fidelity-worker-status.md. - Prepared packets:
invocations/broad-fidelity-workers/R01/agent-invocation-packet.mdinvocations/broad-fidelity-workers/R02/agent-invocation-packet.mdinvocations/broad-fidelity-workers/R03/agent-invocation-packet.mdinvocations/broad-fidelity-workers/R04/agent-invocation-packet.mdinvocations/broad-fidelity-workers/R05/agent-invocation-packet.md
2026-06-12: Broad-Fidelity Workers Sent
- R01 thread:
019eb8b0-d226-7733-9c24-0f65840c37e7 - R02 thread:
019eb8b1-1263-7c82-a43d-d2c4b8492d3d - R03 thread:
019eb8b1-5ba1-71e2-9bb9-4377e2c239bd - R04 thread:
019eb8b1-9923-75c3-a500-0fe33db6bfd9 - R05 thread:
019eb8b1-f796-7af1-a2d7-0564617dd257 - Status at dispatch:
sent_in_progress.
R04 retry:
- Original R04 thread
019eb8b1-9923-75c3-a500-0fe33db6bfd9did not produceR04/returned-output.mdafter repeated checks. - Replacement R04 thread created:
019eb8bc-8d94-7382-ad6c-8ee5c586b36a. - Accepted R04 output path remains
invocations/broad-fidelity-workers/R04/returned-output.md.
2026-06-12: Broad-Fidelity Workers Returned
- R01 returned and verified.
- R02 returned and verified.
- R03 returned and verified.
- R04 returned; accepted file metadata is
broad-fidelity-R04-retry1withsupersedes_thread_id: 019eb8b1-9923-75c3-a500-0fe33db6bfd9. - R05 returned and verified.
01-topic-map.mdand02-material-routing-log.mdstill do not exist.topics/andaudits/remain empty.- Next allowed stage: synthesis-prep over file-backed worker outputs.
Runtime Boundary
The main session may:
- register the source
- create source maps and run notes
- prepare invocation packets and prompts
- record child-thread ids and returned-output status
- integrate file-backed participant outputs after they return
The main session must not:
- perform the Step 0 whole-source analysis itself
- create final 01-topic-map.md before Step 0 human confirmation
- perform evidence routing or material-unit extraction
- create topic docs from direct source reading
- treat prompt-only or packet-only stages as executed
Next Gate
The old Step 0 gate is complete. Current continuation handoff:
handoff/continuation/2026-06-12-after-broad-fidelity-workers-handoff.md
Current next step:
synthesis-prep over five file-backed worker outputs
No additional user confirmation is needed before synthesis-prep. User confirmation is required before promoting any synthesis result to 01-topic-map.md.
2026-06-12: Synthesis Prep, Topic Map, And Material Routing
- Synthesis-prep output created at
invocations/synthesis-prep/returned-output.md. - User confirmed topic-map promotion boundaries in conversation; durable record created at
invocations/synthesis-prep/human-confirmation.md. 01-topic-map.mdcreated with复杂度放置门as root and专家型 Agentic 运行治理under that root.- Workflow rules were corrected so material routing is not a standalone "should we continue?" confirmation gate. Human gates now pause only when user-level decisions are needed.
02-material-routing-log.mdcreated from the five broad-fidelity worker returned outputs and confirmed topic map.- Routing status:
- R01 units routed: 16
- R02 units routed: 16
- R03 units routed: 18
- R04 units routed: 15
- R05 units routed: 16
- Total material units routed: 81
- Still not created: topic docs, audits, model assets, writing-workbench handoff, article outline.
- Next mechanical stage: prepare topic-doc drafting groups from
02-material-routing-log.md. - Pause only if topic-doc preparation exposes new user-level decisions such as topic elevation, downstream scope expansion, model-asset creation, source-disposable claims, or writing-workbench handoff.
2026-06-12: Topic Docs Created
- Topic docs created from
02-material-routing-log.mdand worker returned outputs:topics/01-complexity-placement-gate.mdtopics/02-practice-cases.mdtopics/03-agentic-governance.mdtopics/04-hifi-studio-patch.mdtopics/05-agentic-handbook-materials.mdtopics/06-document-layering-and-carryover.md
- Integration mode explicitly marked as
main_session_integration_from_worker_outputs. - Primary source was not reread for topic-doc extraction.
- Topic docs do not create model assets, article outline, formal HiFi patch, formal Handbook, or downstream handoff.
- Next mechanical stage: verification / coverage and distortion check over topic map, routing log, and topic docs.
- Pause only if verification exposes user-level decisions or requests a repair strategy.
2026-06-12: Bounded Audit And Continuation Handoff
- Coverage audit created at
audits/coverage-audit.md. - Distortion risk log created at
audits/distortion-risk-log.md. - Audit result:
pass_with_noted_boundaries. - Audit did not require user repair strategy.
- Continuation handoff created at
handoff/continuation/2026-06-12-after-topic-docs-and-audit-handoff.md. - Still not created: model assets, formal HiFi patch, formal Agentic Handbook, writing-workbench handoff, article outline, video-workbench topic.