the-mindscape-of-bro-tsong/reports/Round05_1_web_ccra_acceptan...

2.2 KiB

Round 05.1 Web CCRA Acceptance Report

Date: 2026-06-19

Round: 05.1

Review: Web CCRA acceptance for Round 05.1 selector calibration scoped patch

1. Acceptance Status

  • status: PASS_WITH_MINOR_PACKAGING_NOTE
  • round_status: close_as_document_only
  • Web CCRA accepted Round 05.1 as a scoped selector calibration patch.
  • No Round 05.1a selector repair is required.
  • No lifecycle promotion is authorized.
  • No new regression additions are required now.

2. Accepted Behavior Outcome

Evidence marker: Web CCRA acceptance was provided by the Owner on 2026-06-19 and applies to the Round 05.1 selector behavior outcome below.

  • Targeted behavior changes accepted: 7.
  • Non-target behavior changes accepted: 0.
  • Independent routing diff ATTENTION status accepted as expected missing-before calibration additions.

Targeted cases covered by this Web CCRA acceptance:

  • R04-BI-010
  • R04-BI-011
  • R04-BI-012
  • R04-BI-013
  • R04-BI-015
  • R04-BI-017
  • R04-BI-030

3. Lifecycle Status

QPI remains:

  • status: draft
  • stability_level: B
  • regression_status: pending

Intellectual Archaeology remains:

  • status: draft
  • stability_level: B
  • regression_status: pending

Round 05.1 Web CCRA acceptance does not authorize model lifecycle promotion.

4. Regression Status

  • No new regression additions are required now.
  • Round 05.1 calibration rows may remain calibration material unless a future Owner / CCRA decision selects specific cases for regression.
  • The full Round 04 blind pool must not be converted into regression as part of this closeout.

5. Minor Note

MN-05.1-001

Verify whether the raw included 06_ROUND05_POLICY_DECISION_MATRIX.md reflects accepted Q01-Q19 decisions.

If it does not, add a packaging note or update it in a documentation-only follow-up.

This is not a selector repair.

This note does not authorize:

  • selector rule changes;
  • selector calibration input changes;
  • regression additions;
  • lifecycle promotion;
  • Round 05.1a opening.

6. Next Work Item

Next work item: future calibration / product-contract discussion.

Do not continue Round 05.1 as another selector patch unless a future Owner / CCRA decision explicitly authorizes a new scoped repair round.