7.0 KiB
R4 Formal-Run Simulation Handoff
Date: 2026-06-24
Project:
projects/2026-06-23-在路上
Status
The third session / SubAgent workflow test is complete.
R3 accepted results:
S-33->slides/s33/s33-v2-image.pngS-06->slides/s06/s06-v2-image.png
R3 mechanism result:
- Clean child session:
019ef876-c5b2-7202-b204-774cb5fb95fd Agent S-33:019ef87a-3aa1-75a2-a97c-de8f57e234e1Agent S-06:019ef886-8797-7243-9427-d45065fcfc47- Both slide agents were distinct one-shot internal workers.
- Review files were intentionally absent.
- Prompts recorded
gpt-image-2Advisor mode plus style and character references. - User accepted both images.
The user will manually commit the current documentation updates. R4 should start in a new clean session after that commit.
Rules Updated Before R4
Read these first in the new session:
AGENTS.md
docs/workflows/slide-task-orchestration.md
docs/workflows/slide-task-templates.md
projects/2026-06-23-在路上/project.md
projects/2026-06-23-在路上/execution-plan.md
projects/2026-06-23-在路上/slides/slides.md
Key runtime rules:
子会话/session: clean user-visible Codex child thread, created withcreate_thread; do not use forked inherited-context threads by default.Agent/SubAgent: internal one-shot worker owned by the child session.- One slide Agent handles exactly one slide/version, writes one return, then becomes terminal / closed.
- Closed Agents must not be continued or reused.
- Main session production default: dispatch, wait, read short handoff, continue. Do not audit prompt / return / ledger / image details when the child reports complete with completion gate pass.
- Waiting rule: first wait 10 minutes; if incomplete, poll every 1 minute; stop routine waiting at 15 minutes total and inspect/report timeout.
- Child-session completion gate is mandatory.
- Instruction / visual review is optional and should run only when the task asks for review.
无 reviewmeans nosNN-vN-review.md; return and handoff still record that review was intentionally suppressed.
Completion Gate Expected From Child Session
The child session must verify and summarize:
- each target slide version was resolved by scanning existing
slides/sNN/sNN-v*-*files; - no target file was overwritten;
- expected brief, packet, prompt, image, and return files exist for each slide;
- review files are present or absent according to the task rule;
- each slide/version has exactly one owning Agent;
- each Agent is terminal / closed after return;
- visible-context image references were loaded when required, or generation blocked before text-only identity-critical output;
- generated project image paths and hashes are recorded when available;
- handoff includes a compact parent summary.
If any item fails, return blocked, failed, or warning and name what the main session should inspect.
Slide Inventory
Project-Confirmed Complete / Keep
Total: 11.
| Group | Shots | Notes |
|---|---|---|
| Core / anchor trial | S-01, S-10, S-46, S-47, S-51 |
Accepted five-shot visual trial. 阶段五-核心单镜.md only expands S-10, S-46, and S-51; S-01 and S-47 were included by the anchor-test package. |
| Character-consistency intake | S-05, S-14, S-21, S-25, S-33 |
These are the five shots from 阶段五-人物一致性单镜.md. S-05 has an overwrite workflow defect but has prompt/review/reference evidence. S-14 image is accepted but has historical duplicate-Agent mechanism defect. S-21, S-25, and S-33 are accepted. |
| Temporary no-single-shot-skeleton test | S-06 |
Accepted in R3 as s06-v2; clean session-04 continuation and mechanism pass. |
Generated Before But Must Be Redone
These have broad-run v1 images but no reliable brief/prompt/review trace. They cannot prove use of the style master or active references. Keep the existing v1 files as historical evidence only; formal production should create the next append-only version.
S-02, S-03, S-04, S-07, S-08, S-09,
S-11, S-12, S-13, S-15, S-16, S-17,
S-18, S-19, S-20, S-22, S-23, S-24,
S-26, S-27, S-28, S-29, S-30, S-31,
S-32, S-34
Total: 26.
Not Started
These have no slide artifacts yet.
S-35, S-36, S-37, S-38, S-39, S-40,
S-41, S-42, S-43, S-44, S-45,
S-48, S-49, S-50
Total: 14.
Recommended R4 Scope
Use:
S-02
S-03
S-04
Expected new versions:
s02-v2
s03-v2
s04-v2
Reasoning:
- They are the first unfinished consecutive shots after accepted
S-01. - They start real production from the beginning rather than only testing isolated character shots.
- They exercise three useful cases in one child session:
S-02: distant small traveler / environment-led human shot.S-03: body / prop detail shot.S-04: landscape-led no-face road shot.
- All three already have broad-run
v1images, so append-only version handling is tested.
Recommended task settings unless user changes them:
running mode: prompt and generate
review: none
completion gate: required
main-session audit: none unless child handoff reports warning / blocked / failed
child-session capacity: 3 slides
R4 Test Goals
R4 should simulate formal production rather than another audit-heavy mechanism test.
Main-session expectations:
- create one clean child session;
- send the R4 packet for
S-02,S-03, andS-04; - wait 10 minutes before checking;
- if incomplete, poll every 1 minute up to 15 minutes total;
- when the child reports
completewithcompletion_gate: pass, continue without opening detailed prompt / return / ledger / image files; - only inspect details if the child returns
blocked,failed,warning, missing completion evidence, duplicate worker, artifact collision, or user-requested audit.
Child-session expectations:
- handle all 3 assigned slides sequentially;
- resolve versions by scanning existing files;
- write one brief and one packet per slide;
- launch exactly one internal one-shot Agent per slide;
- ensure each Agent closes after return;
- write prompt and image for each slide;
- write no review files unless the task explicitly changes review mode;
- run the completion gate;
- return a compact handoff usable by the main session.
After R4
If R4 succeeds, production does not need to remain limited to only three total shots. The next step can either:
- continue in additional 3-shot child sessions, or
- move to a broader user-approved production scope while preserving child-session completion gates and one-shot slide Agents.
The next natural unfinished sequence after R4 would be:
S-07
S-08
S-09
because S-05 and S-06 are already in the keep set.
Non-Goals For R4
- Do not invoke CCPE.
- Do not ask GPT V2 for final prompts.
- Do not call Minimax MCP or external vision/review tools unless the user explicitly changes the task.
- Do not reuse or continue R3
Agent S-33orAgent S-06. - Do not backfill old broad-run
v1images as if they had original prompt traces. - Do not overwrite existing slide artifacts.