video-workbench/projects/2026-07-01-为什么是我们/project.md

5.4 KiB
Raw Permalink Blame History

2026-07-01-为什么是我们

Status

  • Status: P01-P22 full-page image production completed via production-light child sessions.
  • Medium type: 16:9 internal sales-alignment PPT.
  • Output direction: full-page visual-image-led deck.
  • Current phase: PPT assembly complete.
  • Next phase: user visual sampling or append-only repairs if requested.
  • Review default after validation: none, unless the user requests append-only repair.

Positioning

This deck is the prequel / confidence-fronting deck for 2026-06-29-搭上AI这条船.

The previous deck answered:

我们怎么上船,怎么组队,怎么训练,怎么开始干。

This deck answers:

为什么这艘船值得上?为什么不是平台?为什么不是普通 AI 开发公司?客户凭什么选我们?

The deck is an internal sales cognition and confidence alignment file. It is not a customer proposal and not a full re-compression of source material.

Fixed Mainline

The P1-P22 story line is fixed:

问题提出 → 市场对照 → 我们定位 → 客户选择理由 → 内部短板 → 销售武器库建设路线图

The final portable internal consensus is:

平台解决工具怎么搭,普通 AI 开发公司解决功能怎么做,我们解决专家能力怎么被抽取、封装、验证、校准,并进入客户真实业务流程。

Source Hierarchy

Primary deck authority:

  1. intake/阶段5P1-P22 单页设计骨架.md
  2. intake/阶段3PPT 总纲 v1.md
  3. intake/阶段4通用表达与视觉系统.md

Style continuity reference:

../2026-06-29-搭上AI这条船/visual-system/
../2026-06-29-搭上AI这条船/slides/s01/s01-v1-image.png
../2026-06-29-搭上AI这条船/slides/s10/s10-v1-image.png

Backup fact-check source only:

C:\Users\wangq\Documents\Codex\knowledge-vault\work\internal\OPC销售\为什么是我们.md

Fact-check rule:

原材料只作事实校验,不允许重新压缩成 PPT不允许新增大段原文不允许改变 P1-P22 主线。

The backup source has not been used to create the validation pages. It should be opened only when a factual claim in the accepted intake needs verification.

Visual Direction

Continue the accepted previous deck base:

深蓝黑商务底 + AI 航线 + 雷达 + 罗盘 + 金色 / 青色高亮关键词。

This deck should be harder and more sober than the kickoff deck:

上一套是“上船”;这一套是“看清水深”。

Working visual sentence:

深蓝黑 AI 航线作战图底板上,进入更深的业务水域:平台是工具箱,普通 AI 开发公司是施工队,我们是专家智能体的系统架构师与模具师。

Validation Scope

The user authorized two validation pages:

Slide Role Validation Target
P01 / S-01 Cover Tests the harder prequel cover tone: deepwater, title, route-map base, sales confidence framing.
P10 / S-10 Content anchor Tests the core positioning page: expert capability extraction, molding, validation, calibration, and workflow entry.

The validation stage did not require completeness or broad quality checks. On 2026-07-01, the user confirmed P01 and P10 passed and authorized formal production.

Operating Defaults

Item Default
Current line production-light
After validation production-light active
Running mode prompt and generate
Review mode user sample check only; no routine review file
Write policy append-only; overwrite allowed: no
Image prompt workflow gpt-image-2 Advisor / host-native Mode B
Generated media policy keep Markdown control files in Git; generated images are asset-layer files recorded by path

Generated Validation Outputs

Slide Project Image Path Host Default Source
S-01 slides/s01/s01-v1-image.png C:\Users\wangq\.codex\generated_images\019f1b6b-387f-7be2-af0a-03761085cdae\ig_03b93517b169e69c016a44798e01f481918324c93b7cc1cdef.png
S-10 slides/s10/s10-v1-image.png C:\Users\wangq\.codex\generated_images\019f1b6b-387f-7be2-af0a-03761085cdae\ig_08ab80c795c4cfff016a447a1cae588191ae265e781d9dca16.png

Assembled Deck

Artifact Path Notes
PPTX slides/why-us-full-page-images.pptx 22 slides; one full-slide image per page.

Assembly verification:

  • The PPTX was exported with @oai/artifact-tool.
  • The exported PPTX was re-imported successfully with 22 slides.
  • Final rendering produced 22 preview PNGs in scratch.
  • slides_test.py passed with no overflow detected.

Production Packages

Parent callback target:

019f1b6b-387f-7be2-af0a-03761085cdae
Package Scope Status Notes
package-01 S-02 through S-09 complete from 019f1b86-b337-7553-9084-610f0421e5e3 8-page ordinary production package. Handoff: tasks/2026-07-01-production-dispatch/package-01-handoff.md.
package-02 S-11 through S-18 complete from 019f1b87-7dd8-7e91-b50e-7f2e25dd5464 8-page ordinary production package. Handoff: tasks/2026-07-01-production-dispatch/package-02-handoff.md.
package-03 S-19 through S-22 complete from 019f1b88-4d73-79e1-bf4d-b59d7e79dfa0 4-page closing package. Handoff: tasks/2026-07-01-production-dispatch/package-03-handoff.md.

Next Action

PPT assembly is complete. Next work is user visual sampling or append-only repair for any page the user marks unusable.