video-workbench/projects/2026-06-23-在路上/tasks/2026-06-25-8slide-compressi.../production-run-status.md

3.2 KiB

Production Run Status

Status

  • Project: projects/2026-06-23-在路上
  • Lifecycle phase: production
  • Line: production-light
  • Running mode: prompt and generate
  • Review mode: none
  • Package size: 8-slide validation override for this task only
  • User confirmation: received; production-stage default is no per-image human review
  • Current status: accepted; default package rule promoted

Scope

  • Total target units: S-38, S-39, S-40, S-41, S-42, S-43, S-44, S-45
  • Completed units: S-38, S-39, S-40, S-41, S-42, S-43, S-44, S-45
  • Active child session: none; child session 019efc48-d4af-7972-8646-6d04778dfb2c completed
  • Next cursor: remaining not-started scope S-48/S-49/S-50

Callback Target

  • Parent thread: 019efc02-1a26-7e73-9bb6-c1d540101d52
  • Callback mode: child writes handoff first, then sends callback as final action

Latest Callback

  • Status: complete
  • Topology: direct-child
  • Review mode: none
  • Resolved versions: S-38 -> s38-v1; S-39 -> s39-v1; S-40 -> s40-v1; S-41 -> s41-v1; S-42 -> s42-v1; S-43 -> s43-v1; S-44 -> s44-v1; S-45 -> s45-v1
  • Handoff path: projects/2026-06-23-在路上/tasks/2026-06-25-8slide-compression-validation/session-01/child-session-handoff.md
  • Image paths: projects/2026-06-23-在路上/slides/s38/s38-v1-image.png; projects/2026-06-23-在路上/slides/s39/s39-v1-image.png; projects/2026-06-23-在路上/slides/s40/s40-v1-image.png; projects/2026-06-23-在路上/slides/s41/s41-v1-image.png; projects/2026-06-23-在路上/slides/s42/s42-v1-image.png; projects/2026-06-23-在路上/slides/s43/s43-v1-image.png; projects/2026-06-23-在路上/slides/s44/s44-v1-image.png; projects/2026-06-23-在路上/slides/s45/s45-v1-image.png
  • Problems: none
  • Needs user: none
  • Parent verification: expected files present, exact review files absent, slide rows updated, and child thread tail shows no project file writes or checks after the callback/final child response.
  • User acceptance/rule promotion: user promoted this 8-slide validation to production-pass and reported 174K tokens / 67% context / 38m37s elapsed.

Compression Reload Surface

If the parent is compressed before or after callback, reload:

  1. AGENTS.md
  2. handoff/2026-06-25-on-the-road-formal-production-handoff.md
  3. docs/workflows/project-lifecycle.md
  4. docs/workflows/slide-task-orchestration.md
  5. docs/workflows/slide-task-templates.md
  6. projects/2026-06-23-在路上/project.md
  7. projects/2026-06-23-在路上/execution-plan.md
  8. projects/2026-06-23-在路上/slides/slides.md
  9. projects/2026-06-23-在路上/tasks/2026-06-25-8slide-compression-validation/production-run-status.md
  10. projects/2026-06-23-在路上/tasks/2026-06-25-8slide-compression-validation/task-log.md

Do not read prompt/image details unless the callback reports blocked, failed, warning, artifact collision, or the user asks for inspection.

Stop Conditions

  • Stop on blocked, failed, warning, artifact collision, missing reference, tool failure, or ambiguous scope/status.
  • Stop after clean completion only if the handoff reports a problem or the task explicitly asks for human review.
  • Default ordinary production-light package size is now up to 8 slides.