4.4 KiB
2026-06-29-搭上AI这条船
Status
- Status: P01-P24 full-page image production completed via production-light child sessions.
- Medium type: 16:9 internal kickoff meeting PPT.
- Output direction: full-page visual-image-led deck.
- Lifecycle phase: page image production complete.
- Workflow phase: production-light run completed for remaining pages.
- Review default for later production: none, unless the user requests sampling or repair.
- Current execution focus: optional PPT assembly, user visual sampling, or append-only repairs if requested.
Meeting Positioning
This deck is for an internal kickoff speech. It is not an archive version of the charter, not a customer proposal, and not a formal training courseware package.
The deck should create shared confidence, make the team feel they can board the AI route now, and move directly into first-week AI training goals.
Core sentence:
船票有了,航线有了,人也找对了。现在先上船,边学边打。
Output Format Decision
The user selected:
整页视觉图为主。
Execution meaning:
- Each PPT page may be treated as a 16:9 full-page visual image.
- Page text may appear directly inside the generated image.
- Minor typography, font-size, and typo imperfections are acceptable because this is a time-constrained internal meeting deck.
- The deck should prioritize atmosphere, momentum, page-level judgment, and visual memory over fine editable text polish.
- If a page has too much text for reliable image rendering, the working default is to simplify visible text to title, core judgment, and short labels.
Source Hierarchy
Main PPT authority:
intake/阶段5:P1-P24 单页设计骨架.mdintake/阶段5:页面清单骨架.mdintake/阶段5:全局页面规则.mdintake/阶段4:通用表达与视觉系统.mdintake/阶段3:搭上 AI 这条船PPT总纲.md
Backup fact-check source only:
C:\Users\wangq\Documents\Codex\knowledge-vault\work\internal\OPC销售\AI智能化客户经营团队启动会议章程.md
The charter must not be re-compressed into the main PPT. Use it only if a factual claim in the intake files needs verification.
Accepted Intake
| File | Role | Use |
|---|---|---|
intake/阶段3:搭上 AI 这条船PPT总纲.md |
meeting story | Main emotional arc, timing, and core story chain. |
intake/阶段4:通用表达与视觉系统.md |
expression / visual system | Tone, language, visual motifs, page family guidance. |
intake/阶段5:P1-P24 单页设计骨架.md |
page-level authority | Canonical page order, page titles, conclusions, and per-page visual direction. |
intake/阶段5:全局页面规则.md |
global page rules | Deck tone, text strategy, and shared visual elements. |
intake/阶段5:页面清单骨架.md |
page table | Compact page list and key-page treatment notes. |
Current Visual Direction
深蓝黑商务底 + AI 航线图 + 雷达光效 + 青色/金色高亮关键词 + 船票 / 罗盘 / 路线图 / 作战地图视觉母题。
The feel should be:
兄弟一起开新局,但要按公司化打法打仗。
Accepted base direction:
每页底板风格完全统一;统一深蓝黑 AI 航线作战图底盘,按页面家族只做轻微母题变化。
Key Local Execution Files
| File | Purpose |
|---|---|
execution-plan.md |
Current execution control and next decision. |
visual-system/visual-system.md |
Merged shared visual system. |
visual-system/style/style-prompt-master.md |
Reusable style and prompt-language master for later page prompts. |
visual-system/motifs/motif-registry.md |
Motif-to-page-family registry. |
slides/slides.md |
P01-P24 page execution status table. |
tasks/2026-06-29-visual-system-alignment/task-plan.md |
Current setup and visual-system alignment task. |
Production Handoff
Current handoff for the next clean session:
handoff/2026-06-29-ai-ship-formal-production-handoff.md
User decision evidence:
- 2026-06-29: user confirmed both generated sample images passed:
slides/s01/s01-v1-image.pngandslides/s02/s02-v1-image.png. - 2026-06-29: formal production completed for
s03-s24across three direct child sessions; review modenone.
Next Action
Use the completed page images as the production-pass source for optional PPT assembly. If the user finds a page unusable, repair it append-only as a new sNN-vN version.