video-workbench/projects/2026-07-01-为什么是我们/slides/s12/s12-v1-prompt.md

3.6 KiB

S-12 Slide Prompt V1

Status

  • Prompt saved before generation.
  • Line: production-light
  • Review mode: none
  • Output image: slides/s12/s12-v1-image.png

Based On Brief

slides/s12/s12-v1-brief.md

Reference Inputs

  • Image 1: projects/2026-07-01-为什么是我们/slides/s01/s01-v1-image.png as style continuity reference, not edit target.
  • Image 2: projects/2026-07-01-为什么是我们/slides/s10/s10-v1-image.png as style continuity reference, not edit target.
  • Image 3: projects/2026-06-29-搭上AI这条船/slides/s01/s01-v1-image.png as style continuity reference, not edit target.
  • Image 4: projects/2026-06-29-搭上AI这条船/slides/s10/s10-v1-image.png as style continuity reference, not edit target.

Operation Notes

  • Use the loaded reference images only for visual continuity.
  • Do not call Garden generation scripts.
  • Backup fact-check source was not opened or used; no factual claim needed verification.

Advisor / Host-Native Record

  • Skill mode command: node C:\Users\wangq\.agents\skills\gpt-image-2\scripts\check-mode.js --json
  • Mode result: B-or-C; recommendation: host-or-advisor; Garden disabled; API key absent; effective path: Mode B because host image_gen is available.
  • Skill/template files read: SKILL.md, references/prompt-writing.md, references/slides-and-visual-docs/visual-report-page.md, references/slides-and-visual-docs/dense-explainer-slides.md, references/slides-and-visual-docs/educational-diagram-slide.md, and system imagegen/SKILL.md.
  • Project files actually read: AGENTS.md, project.md, execution-plan.md, slides/slides.md, visual-system/visual-system.md, visual-system/style/style-prompt-master.md, visual-system/motifs/motif-registry.md, and the three accepted intake files.

Final Prompt

Create a 16:9 full-page visual slide image for an internal sales-alignment PowerPoint. Use Image 1-4 as style continuity references only: dark navy-black executive AI route-map base, radar rings, compass geometry, deepwater business layers, cyan signal paths, restrained gold key markers, sober analytical tone.

Page: P12 / S-12. Main title, large readable Chinese: "普通 AI 开发公司的路径 vs 我们的路径". Core judgment: "前者做 AI 功能开发,后者做专家能力工程化".

Make a dual-process comparison. Left column is "普通 AI 开发路径": a short straight gray-blue development pipeline with compact nodes labeled "需求", "功能清单", "选模型", "Prompt", "RAG / 工作流", "上线调试". It should look capable but shallow, like an engineering conveyor.

Right column is "我们的路径": a deeper layered route through an AI deepwater operation map, with brighter cyan path and gold decision markers. Nodes: "业务困惑", "QPI 判断", "该不该做 AI", "专家抽取", "岗位定义", "智能流验证", "试点校准", "系统化建设". Use small probe-route visuals, a precision mold core, and workflow-entry line.

In the center add a strong contrast label: "AI 功能开发 vs 专家能力工程化". Bottom judgment bar: "普通路径从功能开始,我们从问题性质开始".

Keep the page rigorous, readable, and not overcrowded. Use one title, one core judgment, two process lanes, and short labels only. Avoid logos, watermarks, developer-bashing, platform-bashing, generic SaaS dashboards, humanoid robots, stock meeting people, and long paragraphs.

Negative / Avoid

Do not imply ordinary AI developers are incapable; show a different starting logic. Do not overload the right path with tiny unreadable text.

Output Intent

Copy host-generated image to projects/2026-07-01-为什么是我们/slides/s12/s12-v1-image.png.