video-workbench/projects/2026-07-01-为什么是我们/execution-plan.md

3.1 KiB

Execution Plan

Current Medium Branch

  • Branch: internal sales-alignment PPT full-page visual image production.
  • Format: 16:9 horizontal.
  • Main page count: 22.
  • Output path: page images first, optional PPT assembly later.
  • Prompt ownership: Codex owns final image prompts; intake files are source specification, not final prompts.
  • Image workflow: gpt-image-2 Advisor / host-native path only unless the user explicitly changes policy.

Current Execution Focus

Production closeout:

  1. P01 / s01: cover sample passed.
  2. P10 / s10: content anchor sample passed.
  3. Remaining pages completed in packages of up to 8.
  4. Final full-image PPTX assembled under slides/.

The user explicitly authorized formal production after approving both validation images.

Validation Decision Rule

Result Action
P01 has a common base-style issue Revise visual-system/ and regenerate append-only.
P01 has only a cover issue Revise only slides/s01/ append-only.
P10 has a content-page system issue Revise visual-system/ and style-prompt-master.md, then regenerate append-only.
P10 has only a local composition issue Revise only slides/s10/ append-only.
P01 and P10 pass Enter production-light for remaining pages.

Production Defaults After Validation

Item Default
Line production-light
Review none
Carrier clean child session if package production is requested
Scope source slides/slides.md plus user-authorized package
Versioning next unused sNN-vN; overwrite allowed: no
Fact-check source backup only, never a PPT compression source

Production Packages

Package Scope Child Session Status
package-01 S-02 through S-09 019f1b86-b337-7553-9084-610f0421e5e3 complete
package-02 S-11 through S-18 019f1b87-7dd8-7e91-b50e-7f2e25dd5464 complete
package-03 S-19 through S-22 019f1b88-4d73-79e1-bf4d-b59d7e79dfa0 complete

Current Round

  • R0: project intake files exist.
  • R1: validation page selection aligned: P01 and P10.
  • R2: project control files and visual system initialized.
  • R3: P01 and P10 design / brief / prompt prepared for host-native generation.
  • R4: P01 and P10 validation images generated and copied into project slide folders.
  • R5: User confirmed P01/P10 passed; formal production packages authorized.
  • R6: Three clean visible child sessions created and dispatched for S02-S09, S11-S18, and S19-S22.
  • R7: package-03 callback received; S19-S22 verified present and recorded complete.
  • R8: package-01 callback received; S02-S09 verified present, no review files found, and recorded complete.
  • R9: package-02 callback received; S11-S18 verified present, no review files found, and recorded complete. Full P01-P22 image production is now complete.
  • R10: assembled slides/why-us-full-page-images.pptx; artifact-tool import reported 22 slides; final render produced 22 PNG previews; slides_test.py passed with no overflow.

Open Decision

Optional next steps: run user-directed visual sampling or route append-only repairs for any page the user marks unusable.