69 lines
3.1 KiB
Markdown
69 lines
3.1 KiB
Markdown
# Execution Plan
|
|
|
|
## Current Medium Branch
|
|
|
|
- Branch: internal sales-alignment PPT full-page visual image production.
|
|
- Format: 16:9 horizontal.
|
|
- Main page count: 22.
|
|
- Output path: page images first, optional PPT assembly later.
|
|
- Prompt ownership: Codex owns final image prompts; intake files are source specification, not final prompts.
|
|
- Image workflow: `gpt-image-2` Advisor / host-native path only unless the user explicitly changes policy.
|
|
|
|
## Current Execution Focus
|
|
|
|
Production closeout:
|
|
|
|
1. P01 / `s01`: cover sample passed.
|
|
2. P10 / `s10`: content anchor sample passed.
|
|
3. Remaining pages completed in packages of up to 8.
|
|
4. Final full-image PPTX assembled under `slides/`.
|
|
|
|
The user explicitly authorized formal production after approving both validation images.
|
|
|
|
## Validation Decision Rule
|
|
|
|
| Result | Action |
|
|
| --- | --- |
|
|
| P01 has a common base-style issue | Revise `visual-system/` and regenerate append-only. |
|
|
| P01 has only a cover issue | Revise only `slides/s01/` append-only. |
|
|
| P10 has a content-page system issue | Revise `visual-system/` and `style-prompt-master.md`, then regenerate append-only. |
|
|
| P10 has only a local composition issue | Revise only `slides/s10/` append-only. |
|
|
| P01 and P10 pass | Enter production-light for remaining pages. |
|
|
|
|
## Production Defaults After Validation
|
|
|
|
| Item | Default |
|
|
| --- | --- |
|
|
| Line | production-light |
|
|
| Review | none |
|
|
| Carrier | clean child session if package production is requested |
|
|
| Scope source | `slides/slides.md` plus user-authorized package |
|
|
| Versioning | next unused `sNN-vN`; overwrite allowed: no |
|
|
| Fact-check source | backup only, never a PPT compression source |
|
|
|
|
## Production Packages
|
|
|
|
| Package | Scope | Child Session | Status |
|
|
| --- | --- | --- | --- |
|
|
| package-01 | S-02 through S-09 | `019f1b86-b337-7553-9084-610f0421e5e3` | complete |
|
|
| package-02 | S-11 through S-18 | `019f1b87-7dd8-7e91-b50e-7f2e25dd5464` | complete |
|
|
| package-03 | S-19 through S-22 | `019f1b88-4d73-79e1-bf4d-b59d7e79dfa0` | complete |
|
|
|
|
## Current Round
|
|
|
|
- R0: project intake files exist.
|
|
- R1: validation page selection aligned: P01 and P10.
|
|
- R2: project control files and visual system initialized.
|
|
- R3: P01 and P10 design / brief / prompt prepared for host-native generation.
|
|
- R4: P01 and P10 validation images generated and copied into project slide folders.
|
|
- R5: User confirmed P01/P10 passed; formal production packages authorized.
|
|
- R6: Three clean visible child sessions created and dispatched for S02-S09, S11-S18, and S19-S22.
|
|
- R7: package-03 callback received; S19-S22 verified present and recorded complete.
|
|
- R8: package-01 callback received; S02-S09 verified present, no review files found, and recorded complete.
|
|
- R9: package-02 callback received; S11-S18 verified present, no review files found, and recorded complete. Full P01-P22 image production is now complete.
|
|
- R10: assembled `slides/why-us-full-page-images.pptx`; artifact-tool import reported 22 slides; final render produced 22 PNG previews; `slides_test.py` passed with no overflow.
|
|
|
|
## Open Decision
|
|
|
|
Optional next steps: run user-directed visual sampling or route append-only repairs for any page the user marks unusable.
|